Rebota ERP · Manufacturing & Fabrication · Transformer makers · India
Transformer manufacturing ERP software. Runs on Rebota ERP.
Need a website for your factory?See what your budget can build →
Rebota is ERP software for transformer makers in India. It quotes each rating, keeps the core, copper, oil and tank for each design as a bill of materials, sets winding, core assembly and tanking steps in a routing, runs a production order per lot, keeps each unit's serial number, logs quality checks, stamps warranty on each unit sold and takes warranty claims. Starter ₹15,000 a year, up to 5 users, plus GST. 5-day trial with all modules, then a free plan.
Start Rebota for your transformer plant in three steps. No card, no payment.
- 1Enter your name and WhatsApp numberOr continue with Google.
- 2Type the code we send youIt only confirms the number is yours.
- 3Choose your kind of manufacturing businessDiscrete. Rebota then switches on the Manufacturing set: production and BOM, work orders, MRP and more.
After the 5-day trial you can stay on the free plan. Nothing is charged automatically.
Rebota for transformer makers. One account for the whole job.
Rebota keeps a transformer plant's quotes, designs, routings, production, serial numbers, quality checks and warranty in one account. Routine test reports and utility inspection calls are not built yet.
- Each design keeps its core, copper, oil and tank, with its steps in a routing.
- Each unit keeps its serial number and quality checks.
- Warranty is stamped on each unit sold, and claims are taken and closed.
- Routine test reports and utility inspection calls are not built yet.
- Starter ₹15,000 a year, up to 5 users, plus GST. 5-day trial with all modules, then a free plan.
Not only transformer makers. The same steps run these too.
The 9 steps below are the same for each of these businesses, so Rebota for transformer makers fits them as it is:
- Distribution transformer makers
- Power transformer makers
- Transformer repair workshops
- Dry type transformer makers
- CT and PT makers
- Stabiliser and isolation transformer makers
- Coil winding job shops
- Compact substation makers
Closest pages: Electrical panel cable manufacturing ERP software →Power transmission contractor software →Electronics manufacturing ERP software →Electrical contractor software →
How a transformer maker runs on Rebota.
9 steps from winning the work to getting paid, each on its own screen in Rebota. The screen is named under each step.
-
01
Win the work
- Quotation for each ratingIn Rebota · Quotations
-
02
Plan
- Core, copper, oil and tank for each designIn Rebota · Bill of Materials
- Winding, core assembly and tanking stepsIn Rebota · Routings
-
03
Do the work
- A production order for each lotIn Rebota · Production Orders
- Serial number on each unitIn Rebota · Serial & Batch
- Quality checks loggedIn Rebota · Quality Checks
-
04
Bill
- Warranty stamped on each unit soldIn Rebota · Invoicing, Serial & Batch
- Warranty claims taken and closedIn Rebota · Repairs & Service
- Payment followed upIn Rebota · Accounts Receivable
Not in Rebota yet: routine test report for each unit; inspection calls from utilities followed up. Keep these in your own register for now.
Enter it once. It reaches your accounts.
What your transformer plant enters in Quotations, Bill of Materials or Routings reaches the same accounts without being typed again. Approvals and a record of who changed what cover all of it.
Transformer makers on Rebota, in detail.
What Rebota does for a transformer maker
| What you need | What Rebota does | Where in Rebota |
|---|---|---|
| Quotes | For each rating. | Quotations |
| Designs | Core, copper, oil. | Bill of Materials |
| Steps | Winding to tanking. | Routings |
| Units | Serial numbers. | Serial & Batch |
| Checks | Quality logged. | Quality Checks |
| Warranty | Stamped on sale. | Invoicing |
| Claims | Taken and closed. | Repairs & Service |
What Rebota does not do yet
- No routine test report for each unit; attach your test sheet for now.
- No tracking of inspection calls from utilities.
- Generating the IRN or the e-way bill number from inside Rebota needs its GST service-provider connection, which was not switched on as of 29 October 2026; until it is, they are generated on the government portals.
What it costs
Starter ₹15,000 a year, up to 5 users, plus GST. Growth ₹45,000 a year, up to 25 users, plus GST.
Every account starts with a 5-day trial with all modules. After the 5-day trial, keep using Rebota free: 1 user, 30 GST invoices a month, stock, suppliers and cash. Upgrade only when you need more.
Free formats and related pages
- Quality inspection report format and purchase order format, free
- ERP for panel and cable makers
- Rebota for power transmission contractors
- ERP for manufacturing compared
Rebota plans at a glance
| Rebota plan | Price | Users | Companies |
|---|---|---|---|
| Basic | ₹5,490 a year, plus GST | Up to 3 | 1 |
| Starter | ₹15,000 a year, plus GST | Up to 5 | 50 |
| Growth | ₹45,000 a year, plus GST | Up to 25 | 50 |
Is Rebota right for you?
Who should use Rebota
Distribution and power transformer makers that sell to utilities, contractors and industry.
Who should not use Rebota (yet)
Plants that need routine test reports and utility inspection calls from the same software; those are not built yet.
When another option is better
A large ERP suite when a group already runs one across many plants; see our manufacturing ERP comparison.
When you do not need software at all
A few units a month built to one design.
Costs to weigh
GST on the plan price.
The short version
Rebota keeps a transformer plant's designs, units, checks and warranty together for Starter ₹15,000 a year, 5 users, plus GST, without routine test reports yet.
How to test it in your trial
Book copper by the lot for each production order. Copper is most of a transformer's cost, and a quote made on last month's rate rarely holds.
Your first week on Rebota
- Add the design BOM for your most sold rating.
- Set its routing from winding to tanking.
- Build one lot with serial numbers.
Questions transformer makers ask
Which is the best ERP for a transformer maker?
One that keeps designs, serial numbers, checks and warranty together. Rebota does this for Starter ₹15,000 a year, 5 users, plus GST.
Can I keep a serial number on each transformer?
Yes. Each unit keeps its serial number from production to sale.
Is warranty kept on each unit?
Yes. Warranty is stamped on each unit when it is sold.
Does it make routine test reports?
Not yet. Attach your test sheet for now.
Can I take warranty claims?
Yes. Claims are taken and closed in repairs and service.
What does it cost?
Starter ₹15,000 a year, up to 5 users, plus GST, with a 5-day trial of all modules.
How does a transformer maker run on Rebota, step by step?
In 9 steps, each on its own screen: quotation for each rating (Quotations); core, copper, oil and tank for each design (Bill of Materials); winding, core assembly and tanking steps (Routings); A production order for each lot (Production Orders); serial number on each unit (Serial & Batch); quality checks logged (Quality Checks); warranty stamped on each unit sold (Invoicing, Serial & Batch); warranty claims taken and closed (Repairs & Service); payment followed up (Accounts Receivable).
What does Rebota not do yet for transformer makers?
Not built yet: routine test report for each unit; inspection calls from utilities followed up. Keep those in your own register for now; everything else on this page is in Rebota today.
Does Rebota also work for distribution transformer makers, power transformer makers or transformer repair workshops?
Yes. The steps on this page are the same for distribution transformer makers, power transformer makers, transformer repair workshops, dry type transformer makers, CT and PT makers, stabiliser and isolation transformer makers, coil winding job shops and compact substation makers: quotation for each rating (Quotations); core, copper, oil and tank for each design (Bill of Materials); winding, core assembly and tanking steps (Routings); A production order for each lot (Production Orders).
Asked another way? Same answer.
Which is the best software for transformer makers?
One that keeps the whole job in one account, not only the bills. For transformer makers, Rebota covers 9 steps, each on its own screen, among them: quotation for each rating (Quotations); core, copper, oil and tank for each design (Bill of Materials); winding, core assembly and tanking steps (Routings); A production order for each lot (Production Orders); serial number on each unit (Serial & Batch). Not built yet: routine test report for each unit; inspection calls from utilities followed up. You can try all of it free for 5 days, with no card.
Transformer maker ka hisab rakhne ke liye kaun sa app accha hai?
Aisa app jo poora kaam ek jagah rakhe: Quotations, Bill of Materials, Routings, Production Orders aur Serial & Batch. Rebota mein yeh sab ek hi account mein hai. 5 din ka free trial hai, card nahin chahiye, aur trial ke baad ek user ke liye free chalta hai. Android app Google Play par hai, aur PC ya laptop par browser mein chalta hai.
Is there free transformer maker software?
Yes. Every account starts with 5 days of all modules and no card, and after that Rebota stays free for 1 user, 30 GST invoices a month, stock, suppliers and cash. When you need more users or modules: Starter ₹15,000 a year, up to 5 users, plus GST.
Is there a mobile app for transformer makers?
Yes. The Rebota ERP app is on Google Play for Android, there is a desktop installer for Windows PCs, and on an iPhone you open Rebota in Safari and add it to the Home Screen. The same account works on all of them, and each person signs in with their own access.
Does it make GST bills for transformer makers?
Yes. In Rebota: warranty stamped on each unit sold (Invoicing, Serial & Batch); warranty claims taken and closed (Repairs & Service); payment followed up (Accounts Receivable). The bills go to the same GST books, with the CGST, SGST and IGST split.
Free formats for transformer makers.
Fill in online and download a PDF, or print one blank. No sign-up.
- Delivery Challan Format
- Purchase Order Format
- Job Card Format
- GRN Format (Goods Receipt Note)
- Material Issue Slip Format
- Quality Inspection Report Format
- GST Invoice Format
- Proforma Invoice Format
- Debit Note Format
- Sales Order Format
- Packing List Format
- Quotation Format
- Credit Note Format
- Material Requisition (Indent) Format
- Stock Register Format
- Muster Roll Format
- All formats →
Not quite you? Rebota has a page for each kind.
- Agro processing units (rice, dal, flour, spices) →
- Auto component manufacturers →
- Ayurvedic and cosmetics manufacturers →
- Tile factories →
- Chemical and process manufacturers →
- Contract manufacturers →
Also: Corrugated box makers · Dairies and milk processors · Dal mills · Electrical panel and cable makers · Electronics and PCB manufacturers · Steel fabricators · Flour mills · Fly ash brick and paver block plants · Food processing units · Forging units · Foundries · Furniture manufacturers · Garment and textile makers · Plastic moulding units · Machine shops and CNC job shops · Namkeen and snacks makers · Nutraceutical makers · Oil mills · Paint makers · PEB manufacturers · Pharmaceutical formulation makers · AAC block and precast makers · Printing presses · Rice mills · Ready-mix concrete plants · Spice makers · Stone crushers · UPVC and aluminium window fabricators · Manufacturing ERP guide · Job work and ITC-04 software
All of Rebota for manufacturing & fabrication →Every Rebota page for manufacturing →Software for transformer makers compared →All industries →
What your transformer plant pays. One price per company.
Start free for 5 days, no card needed. After the trial, keep using Rebota free: 1 user, 30 GST invoices a month, stock and cash.
In India: Basic from ₹5,490 a year for up to 3 users, Starter from ₹15,000 a year for up to 5 users. Billed yearly, GST extra. Plans never renew or charge you automatically.
