Rebota ERP · Infrastructure & EPC · Water and wastewater treatment plant EPC contractors · India
Software for WTP, STP and ETP EPC contractors. Build the plant, prove it works, then run it.
Need a website for your infrastructure company?See what your budget can build →
Rebota is ERP software for water and wastewater treatment plant EPC contractors in India. It tracks the tender and guarantees, keeps the BOQ with rate analysis, buys through compared quotes, records pressure, pump and electrical tests, hands over O&M manuals and as-builts, and bills the monthly O&M without double bills. Starter ₹15,000 a year, up to 5 users, plus GST. 5-day trial with all modules, then a free plan.
Start Rebota for your treatment plant business in three steps. No card, no payment.
- 1Enter your name and WhatsApp numberOr continue with Google.
- 2Type the code we send youIt only confirms the number is yours.
- 3Choose your kind of infrastructure & EPC businessWater and sewerage. Rebota then switches on the Infrastructure & EPC set: BOQ, measurement book, progress (RA) bills and more.
After the 5-day trial you can stay on the free plan. Nothing is charged automatically.
Rebota for water and wastewater treatment plant EPC contractors. One account for the whole job.
A treatment plant contract has three lives: civil tanks and buildings, mechanical and electrical equipment bought and erected, and years of operation after the plant is handed over. Rebota keeps the BOQ, equipment orders, RA bills, commissioning test sheets, the handover file and the monthly O&M invoice of one plant in one account.
- Clarifiers, filters, aeration tanks, pump houses and panels sit in one BOQ, with rate analysis for the civil items.
- Pumps, blowers and mechanisms go through purchase requests, compared supplier quotes and purchase orders.
- Commissioning is written down: pressure, pump, insulation and earthing sheets, plus your own sheets for tank water-tightness or treated-water results.
- The handover file holds O&M manuals, as-built drawings, warranties and test certificates, with the equipment register.
- During the O&M years the monthly invoice repeats itself as a draft you check, and one month is never billed twice.
- Starter ₹15,000 a year, up to 5 users, plus GST. 5-day trial with all modules, then a free plan.
Not only water and wastewater treatment plant EPC contractors. The same steps run these too.
The 8 steps below are the same for each of these businesses, so Rebota for water and wastewater treatment plant EPC contractors fits them as it is:
- WTP contractors
- STP and ETP contractors
- RO plant makers
- Zero liquid discharge (ZLD) plant firms
- Desalination plant contractors
- Packaged STP suppliers
- Water treatment O&M operators
Closest pages: Water pipeline contractor software →EPC contractor software →Solid waste management contractor software →AMC management software →
How a WTP, STP and ETP EPC contractor runs on Rebota.
8 steps from winning the work to getting paid, each on its own screen in Rebota. The screen is named under each step.
-
01
Win the work
- Tender, EMD and bank guarantees with expiry alertsIn Rebota · Tenders & Guarantees
- BOQ and rate analysisIn Rebota · Bill of Quantities, Rate Analysis
-
02
Plan
- Purchase requests, quote comparison and ordersIn Rebota · Purchase Orders
-
03
Do the work
- Concrete cube tests, a failure raises an NCRIn Rebota · Quality & NCR
- Hydro test, pump performance, insulation and earth testsIn Rebota · Testing & Commissioning
-
04
Bill
- RA bills with price variation and advance recoveryIn Rebota · Customer Billing
- Handover: O&M manuals, as-builts, warrantiesIn Rebota · Handover Pack
-
05
Get paid and close
- Monthly O&M bill, made once for each due dateIn Rebota · Recurring invoices
Not in Rebota yet: process and hydraulic design; daily flows, chemicals and lab results of the running plant. Keep these in your own register for now.
Enter it once. It reaches your accounts.
What your treatment plant business enters in Tenders & Guarantees, Bill of Quantities or Purchase Orders reaches the same accounts without being typed again. Approvals and a record of who changed what cover all of it.
Water and wastewater treatment plant EPC contractors on Rebota, in detail.
What Rebota does for a treatment plant EPC contractor
| What you need | What Rebota does | Where in Rebota |
|---|---|---|
| Bid and guarantees | Tender with EMD and fee; then the performance and advance guarantees that run through the defect and O&M years. Guarantees expiring within 30 days are counted; extend, release or invoke each one. | Tenders & Bank Guarantees |
| Civil, mechanical and electrical scope | One BOQ for tanks, buildings, equipment supply, erection, piping and panels; rate analysis of a civil item from materials, labour and plant. | BOQ & Estimation, Rate Analysis |
| Equipment buying | Purchase requests from site or design, supplier quotes set side by side, and purchase orders for pumps, blowers, scrapers, dosing systems and panels. | Purchase Requests, Supplier Quotes & Comparison, Purchase Orders |
| Bills to the authority or industry | RA bills with retention, TDS and LD; mobilisation advance paid and recovered bill by bill; price variation from the indices your contract names. | Client RA Bills |
| Concrete and material tests | Cube and other test results by pour or batch; a failed result with no NCR opens one. | Quality & NCR |
| Commissioning tests | Sheets for pressure tests, pump flow and head, motor insulation, earth pits and DG load, and your own sheets with the readings you need; limits come from your specification; witness and a printable certificate. | Testing & Commissioning |
| Work inside tanks and wet wells | Permits to work for confined space, height, hot work and electrical work, with their open and closed status. | Safety Checklists |
| Handover to the client | O&M manuals, as-built drawings, warranty and test certificates, approvals and training records, and the register of equipment handed over. | Handover Pack |
| The O&M years | The monthly O&M invoice set to repeat: each due date makes a draft copy that posts only when you confirm it. | Tax Invoices (Repeat this invoice) |
Why the handover file and the O&M bill belong with the build
An STP or ETP is paid in parts: civil work as it is measured, equipment on supply and erection, and a last share only once the plant is tested and handed over. The test readings and the handover documents are what release that last share, and they are also what the client asks for again two years later when a pump fails under warranty.
When the tests, the equipment list and the warranties are kept on the same project as the BOQ and the bills, nothing has to be searched for in old mail. The O&M contract then runs from the same account: the monthly invoice repeats, and the guarantee given for the O&M period stays on the guarantee list with its expiry date.
What Rebota does not do yet
- No process or hydraulic design of the plant, and no link to the plant's SCADA or flow meters.
- No log of the running plant's daily flows, power, chemicals and lab results; test sheets hold one-off readings.
- Deductions an O&M contract makes when outlet quality misses the norm are not worked out.
- Generating the IRN or the e-way bill number from inside Rebota needs its GST service-provider connection, which was not switched on as of 29 October 2026; until it is, they are generated on the government portals.
What it costs
Starter ₹15,000 a year, up to 5 users, plus GST. Growth ₹45,000 a year, up to 25 users, plus GST.
Every account starts with a 5-day trial with all modules. After the 5-day trial, keep using Rebota free: 1 user, 30 GST invoices a month, stock, suppliers and cash. Upgrade only when you need more.
Starter and Growth can both switch on every screen named on this page, in Modules & Fields.
Free tools, formats and related pages
- Tender margin calculator, concrete volume calculator and retention money calculator, free
- BOQ format, RA bill format and quality inspection report, free
- Software for water supply and pipeline contractors
- ERP for EPC companies compared
Rebota plans at a glance
| Rebota plan | Price | Users | Companies |
|---|---|---|---|
| Basic | ₹5,490 a year, plus GST | Up to 3 | 1 |
| Starter | ₹15,000 a year, plus GST | Up to 5 | 50 |
| Growth | ₹45,000 a year, plus GST | Up to 25 | 50 |
Is Rebota right for you?
Who should use Rebota
Contractors who design, build and commission water, sewage or effluent treatment plants for towns, industries or housing projects, and often run them afterwards.
Who should not use Rebota (yet)
An operator whose main need is a daily log of plant flows, power and lab results against discharge norms.
When another option is better
Our EPC ERP comparison lists other products from their makers' pages.
When you do not need software at all
One small package plant a year, bought complete from one supplier, with no O&M contract after it.
Costs to weigh
GST on the plan price, and typing each test sheet's limits from your specification once.
The short version
Rebota keeps a treatment plant's build, commissioning record, handover file and O&M billing together for Starter ₹15,000 a year, 5 users, plus GST.
How to test it in your trial
Make one test sheet for each tank, pump set and panel before commissioning starts, with the limits from the specification typed in. The witness signs against readings, not against the word "OK".
Your first week on Rebota
- Add one plant as a project and its main equipment to the BOQ.
- Fill one pump performance sheet with real readings.
- Set the O&M invoice to repeat monthly and check the first draft.
Questions water and wastewater treatment plant EPC contractors ask
What is the best software for an STP or ETP contractor in India?
One that keeps the plant's BOQ, equipment orders, bills, commissioning tests and handover file together, and then bills the O&M years. Rebota does this for Starter ₹15,000 a year, 5 users, plus GST.
Can I record commissioning tests of pumps and tanks?
Yes. Testing & Commissioning has sheets for pressure tests, pump flow and head, insulation and earthing, and your own sheets for tank water-tightness or treated-water results, each against the limits you type.
Can it bill a monthly O&M contract?
Yes. Set the O&M invoice to repeat every month; each month makes a draft copy you check before it posts.
Does it track performance guarantees for the O&M period?
Yes. Tenders & Bank Guarantees keeps each guarantee with its expiry, and counts those that expire within 30 days.
What does it cost?
Starter ₹15,000 a year, up to 5 users, plus GST, with a 5-day trial of all modules.
How does a WTP, STP and ETP EPC contractor run on Rebota, step by step?
In 8 steps, each on its own screen: tender, EMD and bank guarantees with expiry alerts (Tenders & Guarantees); BOQ and rate analysis (Bill of Quantities, Rate Analysis); purchase requests, quote comparison and orders (Purchase Orders); concrete cube tests, a failure raises an NCR (Quality & NCR); hydro test, pump performance, insulation and earth tests (Testing & Commissioning); RA bills with price variation and advance recovery (Customer Billing); handover: O&M manuals, as-builts, warranties (Handover Pack); monthly O&M bill, made once for each due date (Recurring invoices).
What does Rebota not do yet for water and wastewater treatment plant EPC contractors?
Not built yet: process and hydraulic design; daily flows, chemicals and lab results of the running plant. Keep those in your own register for now; everything else on this page is in Rebota today.
Does Rebota also work for WTP contractors, STP and ETP contractors or RO plant makers?
Yes. The steps on this page are the same for WTP contractors, STP and ETP contractors, RO plant makers, zero liquid discharge (ZLD) plant firms, desalination plant contractors, packaged STP suppliers and water treatment O&M operators: tender, EMD and bank guarantees with expiry alerts (Tenders & Guarantees); BOQ and rate analysis (Bill of Quantities, Rate Analysis); purchase requests, quote comparison and orders (Purchase Orders); concrete cube tests, a failure raises an NCR (Quality & NCR).
Asked another way? Same answer.
People also look for Rebota for water and wastewater treatment plant EPC contractors as:
- Water treatment plant software
- Water treatment software
Which is the best software for water and wastewater treatment plant EPC contractors?
One that keeps the whole job in one account, not only the bills. For water and wastewater treatment plant EPC contractors, Rebota covers 8 steps, each on its own screen, among them: tender, EMD and bank guarantees with expiry alerts (Tenders & Guarantees); BOQ and rate analysis (Bill of Quantities, Rate Analysis); purchase requests, quote comparison and orders (Purchase Orders); concrete cube tests, a failure raises an NCR (Quality & NCR); hydro test, pump performance, insulation and earth tests (Testing & Commissioning). Not built yet: process and hydraulic design; daily flows, chemicals and lab results of the running plant. You can try all of it free for 5 days, with no card.
Is there free WTP, STP and ETP EPC contractor software?
Yes. Every account starts with 5 days of all modules and no card, and after that Rebota stays free for 1 user, 30 GST invoices a month, stock, suppliers and cash. When you need more users or modules: Starter ₹15,000 a year, up to 5 users, plus GST.
WTP, STP and ETP EPC contractor ka hisab rakhne ke liye kaun sa app accha hai?
Aisa app jo poora kaam ek jagah rakhe: Tenders & Guarantees, Bill of Quantities, Purchase Orders, Quality & NCR aur Testing & Commissioning. Rebota mein yeh sab ek hi account mein hai. 5 din ka free trial hai, card nahin chahiye, aur trial ke baad ek user ke liye free chalta hai. Android app Google Play par hai, aur PC ya laptop par browser mein chalta hai.
Is there a mobile app for water and wastewater treatment plant EPC contractors?
Yes. The Rebota ERP app is on Google Play for Android, there is a desktop installer for Windows PCs, and on an iPhone you open Rebota in Safari and add it to the Home Screen. The same account works on all of them, and each person signs in with their own access.
Does it make GST bills for water and wastewater treatment plant EPC contractors?
Yes. In Rebota: RA bills with price variation and advance recovery (Customer Billing); handover: O&M manuals, as-builts, warranties (Handover Pack). The bills go to the same GST books, with the CGST, SGST and IGST split.
Free formats for water and wastewater treatment plant EPC contractors.
Fill in online and download a PDF, or print one blank. No sign-up.
Not quite you? Rebota has a page for each kind.
- Airport works contractors →
- Bridge and flyover contractors →
- City gas distribution contractors →
- Dam and hydro contractors →
- Industrial EPC contractors →
- Irrigation and canal contractors →
Also: Marine works contractors · Power transmission and distribution contractors · Railway and metro contractors · Road and highway contractors · Solid waste management contractors · Telecom tower and fibre contractors · Tunnelling contractors · Water and sewer pipeline contractors · Wind EPC contractors · Software for government contractors · Tender and bank guarantee tracking · Price escalation bill software · Plant and equipment management
All of Rebota for infrastructure & epc →Every Rebota page for infrastructure →Software for water and wastewater treatment plant EPC contractors compared →All industries →
What your treatment plant business pays. One price per company.
Start free for 5 days, no card needed. After the trial, keep using Rebota free: 1 user, 30 GST invoices a month, stock and cash.
In India: Basic from ₹5,490 a year for up to 3 users, Starter from ₹15,000 a year for up to 5 users. Billed yearly, GST extra. Plans never renew or charge you automatically.
