RebotaREBOTA/Works Search tools, standards, templates… Ctrl K Rebota → Start free
Start free — Rebota ERP Rebota business platform →

Quality Inspection Report Format

Record an incoming, in-process or final inspection: each characteristic with its specification, instrument and readings on five samples, OK or not OK, and the lot decision. Free, no sign-up.

Autosaved to this browser ✓ Ready

① Your business

② Quality Inspection Report details

③ Lines

④ Result

⑤ Remarks

QUALITY INSPECTION REPORT
Generated free with Rebota — rebota.in/formats/quality-inspection-report-format
Nothing you type here is uploaded. The quality inspection report, its totals and the PDF are made in your browser, and your draft is kept in this browser only. Lines left empty print as blank ruled rows, so you can also download it blank and fill it in by hand.

What is a quality inspection report?

A quality inspection report (QIR) records the check of a part, a lot or a delivery against its specification: which characteristics were checked, the limits, what was measured on each sample, and whether the lot passed.

It is used at three points: incoming inspection of purchased material, in-process inspection between operations, and final inspection before dispatch. Customers often ask for the final report with the delivery.

What a quality inspection report must show

Sampling and instruments

For a lot, inspect a sample instead of every piece. Sampling plans such as IS 2500 (ISO 2859-1) give the sample size and the accept and reject numbers for the lot size and the quality level you agree with the customer.

A reading is only as good as the instrument. Write the instrument’s ID on the report and keep its calibration current: a report made with an out-of-calibration gauge proves nothing.

Common mistakes

Who uses this format

Make every quality inspection report in Rebota

In Rebota an inspection plan holds each characteristic’s limits; the inspector records the readings and Rebota works out pass or fail from the limits, not from a tick box. Plans can use AQL sampling, results feed SPC charts, instruments carry calibration records, incoming lots wait in a quarantine store until they pass, and a production operation that needs inspection can’t be closed until it does.

Start Rebota free →

More free formats and tools

Save & Access Anywhere
Save your favorite tools & resources
Smart Search (Ctrl+K)
Find what you need in seconds
Community Support
Ask questions & get real answers
Regularly Updated
New tools, templates & guides added

Frequently Asked Questions

What is a quality inspection report?▾
A record of an inspection: the characteristics checked, their specification, the readings on each sample, the result and the decision on the lot.
How many samples should be inspected?▾
As many as your sampling plan says for the lot size and agreed quality level, for example under IS 2500 (ISO 2859-1). Critical characteristics are often checked on every piece.
What does accepted on deviation mean?▾
The lot does not fully meet the specification, but the customer or design authority has approved its use as it is, in writing, for that lot only.
Margins change with every invoice.Rebota shows live margin by product, customer and project from your actual sales and purchase costs.
See live margins →