Rebota ERP · Infrastructure & EPC · City gas distribution contractors · India
Software for CGD pipeline contractors. Every metre laid, measured, billed and reconciled.
Need a website for your infrastructure company?See what your budget can build →
Rebota is ERP software for city gas distribution contractors in India. It measures laying in the measurement book, reconciles the client's free-issue pipe with its penal factor, records pressure tests with hold time and drop, logs hindrances, issues excavation and hot-work permits, and bills with retention. Starter ₹15,000 a year, up to 5 users, plus GST. 5-day trial with all modules, then a free plan.
Start Rebota for your CGD contracting firm in three steps. No card, no payment.
- 1Enter your name and WhatsApp numberOr continue with Google.
- 2Type the code we send youIt only confirms the number is yours.
- 3Choose your kind of infrastructure & EPC businessIndustrial EPC. Rebota then switches on the Infrastructure & EPC set: projects, contracts, service orders and more.
After the 5-day trial you can stay on the free plan. Nothing is charged automatically.
Rebota for city gas distribution contractors. One account for the whole job.
City gas distribution work is paid by the metre: steel and MDPE pipe of each size laid in trench or by HDD, then tested and restored. The gas company usually issues the pipe and fittings, and asks for an account of every metre. Rebota keeps the stretch-wise measurements, the RA bills, the issued pipe against what the laid length should have used, and the gangs' bills in one place.
- Each BOQ item is one pipe size and method: open-cut MDPE, steel, HDD crossing, road restoration.
- Measurements are entered stretch by stretch with the location, so the RA bill shows where each metre was laid.
- Pipe coils, steel pipe and fittings received from the gas company are set against what the laid metres should have used, with the variation and penal rate from your contract.
- Laying gangs and HDD sub-contractors are billed from their own work orders, with retention, advance recovery and material debit.
- PNG household connections are not tracked one by one yet; this page says so below.
- Starter ₹15,000 a year, up to 5 users, plus GST. 5-day trial with all modules, then a free plan.
Not only city gas distribution contractors. The same steps run these too.
The 8 steps below are the same for each of these businesses, so Rebota for city gas distribution contractors fits them as it is:
- CGD pipeline laying contractors
- PNG house connection contractors
- Steel and MDPE pipeline contractors
- Horizontal directional drilling (HDD) contractors
- CNG station builders
- Gas meter installation contractors
- Pipeline testing and commissioning crews
Closest pages: LPG PNG reticulation software →Water pipeline contractor software →EPC contractor software →Telecom infrastructure contractor software →
How a CGD pipeline contractor runs on Rebota.
8 steps from winning the work to getting paid, each on its own screen in Rebota. The screen is named under each step.
-
01
Do the work
- Free-issue pipe and fittings: receipts, returns, penal recoveryIn Rebota · Free-issue Material
- Excavation and hot-work permitsIn Rebota · Safety
- Daily progress with photos, offline site captureIn Rebota · Site Capture
- Pressure test: test pressure, hold time, dropIn Rebota · Testing & Commissioning
- Hindrance register with extension of timeIn Rebota · Hindrance Register
- Sub-contractor RA billsIn Rebota · Sub-contractor RA Bills
-
02
Bill
- Measurement book linked to the BOQIn Rebota · Measurement Book
- Client RA bills with retention and TDSIn Rebota · Customer Billing
Not in Rebota yet: road-cutting and right-of-use permissions; weld or joint register with radiography. Keep these in your own register for now.
Enter it once. It reaches your accounts.
What your CGD contracting firm enters in Free-issue Material, Safety or Site Capture reaches the same accounts without being typed again. Approvals and a record of who changed what cover all of it.
City gas distribution contractors on Rebota, in detail.
What Rebota does for a CGD pipeline contractor
| What you need | What Rebota does | Where in Rebota |
|---|---|---|
| Rates by size and method | BOQ items for each diameter of MDPE and steel, HDD and boring crossings, valve chambers and road restoration, with the work order rate. | BOQ & Estimation |
| Metres laid, stretch by stretch | Each entry carries its location (road, sector, chainage), nos and length, the BOQ item and the bill it went into. | Measurement Book |
| Bills to the gas company | RA bills from the measured quantities with retention, TDS and LD, and plus or minus lines for anything else the contract adds or deducts. | Client RA Bills |
| Pipe and fittings the gas company gives you | Receipts, returns and site counts; consumption per metre of each BOQ item; the variation allowed and the penal factor typed from the contract; the excess and the recovery the client could make, next to what it has recovered. | Free-issue Material |
| Laying gangs and HDD crews | Work orders and RA bills for each gang or crew, with retention, advance recovery, material debit and TDS; each bill reaches payables as a draft. | Sub-contract Work Orders, Sub-contractor RA Bills |
| Pressure tests | Test pressure, hold time, pressure at start and end, and the drop, on a test sheet; your own sheet for a pneumatic test. | Testing & Commissioning |
| Digging and welding safely | Permits to work for excavation, hot work and confined space. | Safety Checklists |
| Stoppages | Days lost to permission delays or utility clashes, with the overlap removed and the extension asked for and granted. | Hindrance Register |
| Machines and the day's work | HDD rigs and excavators with hours and diesel; daily reports with photos; snags and photos saved on the phone with no signal. | P&M Register, Daily Progress Reports, Site Capture |
Why the free-issue account decides the margin
On many CGD contracts the gas company buys the pipe and hands it over coil by coil. At the end of the job it counts what was laid, what came back and what is still at site. Pipe that cannot be shown is recovered from the contractor's bill, sometimes at a penal rate, and the amount is often larger than the margin on the laying rate.
Rebota works out how much pipe the measured metres should have used, adds the variation your contract allows, and shows the excess before the client does. The counts at site and the returns are dated, so the reply to a recovery letter starts from records, not from memory.
What Rebota does not do yet
- No register of PNG household connections (house, meter number, riser and conversion date). Contractors paid per connection count them in the Measurement Book for now.
- No weld or joint register with radiography or other test results for each joint.
- No register of road-cutting and right-of-use permissions with their fees and validity, and no route map.
- Generating the IRN or the e-way bill number from inside Rebota needs its GST service-provider connection, which was not switched on as of 29 October 2026; until it is, they are generated on the government portals.
What it costs
Starter ₹15,000 a year, up to 5 users, plus GST. Growth ₹45,000 a year, up to 25 users, plus GST.
Every account starts with a 5-day trial with all modules. After the 5-day trial, keep using Rebota free: 1 user, 30 GST invoices a month, stock, suppliers and cash. Upgrade only when you need more.
Starter and Growth can both switch on every screen named on this page, in Modules & Fields.
Free tools, formats and related pages
- Excavation calculator, equipment cost calculator and fuel cost calculator, free
- Measurement book format, RA bill format and material issue slip, free
- Software for water supply and pipeline contractors
- ERP for infrastructure contractors compared
Rebota plans at a glance
| Rebota plan | Price | Users | Companies |
|---|---|---|---|
| Basic | ₹5,490 a year, plus GST | Up to 3 | 1 |
| Starter | ₹15,000 a year, plus GST | Up to 5 | 50 |
| Growth | ₹45,000 a year, plus GST | Up to 25 | 50 |
Is Rebota right for you?
Who should use Rebota
Contractors who lay steel and MDPE gas networks, HDD crossings and restoration for city gas companies, with pipe issued by the client.
Who should not use Rebota (yet)
A firm whose work is mostly PNG household connections, until the connection register is built.
When another option is better
Our infrastructure ERP comparison lists other products from their makers' pages.
When you do not need software at all
One short stretch with one gang, where the pipe issued and laid fits on a single sheet.
Costs to weigh
GST on the plan price, and typing each material's consumption per metre and the contract's variation once.
The short version
Rebota keeps a CGD contractor's metres, bills and issued pipe on one record for Starter ₹15,000 a year, 5 users, plus GST.
How to test it in your trial
Type the variation % and penal factor for each issued material from the contract on the first day, and count the pipe at site every month. A recovery found at the final bill is too late to argue.
Your first week on Rebota
- Add one network area as a project with three pipe sizes in the BOQ.
- Record the first coils received from the gas company.
- Enter one week of laying and look at the free-issue excess.
Questions city gas distribution contractors ask
What is the best software for a CGD pipeline contractor in India?
One that measures metres laid by stretch, bills them, and reconciles the pipe the gas company issued against those metres. Rebota does this for Starter ₹15,000 a year, 5 users, plus GST.
Can it reconcile MDPE coils issued by the gas company?
Yes. Free-issue Material sets receipts, returns and site counts against the metres laid times the consumption per metre, with the variation and penal factor from your contract.
Can I track PNG household connections?
Not one by one yet. There is no connection register with meter numbers; counts can go in the Measurement Book.
Does it hold pressure test records?
Yes. A test sheet keeps test pressure, hold time, start and end pressure and the drop, with a witness and a printable certificate.
What does it cost?
Starter ₹15,000 a year, up to 5 users, plus GST, with a 5-day trial of all modules.
How does a CGD pipeline contractor run on Rebota, step by step?
In 8 steps, each on its own screen: free-issue pipe and fittings: receipts, returns, penal recovery (Free-issue Material); excavation and hot-work permits (Safety); daily progress with photos, offline site capture (Site Capture); pressure test: test pressure, hold time, drop (Testing & Commissioning); hindrance register with extension of time (Hindrance Register); sub-contractor RA bills (Sub-contractor RA Bills); measurement book linked to the BOQ (Measurement Book); client RA bills with retention and TDS (Customer Billing).
What does Rebota not do yet for city gas distribution contractors?
Not built yet: road-cutting and right-of-use permissions; weld or joint register with radiography. Keep those in your own register for now; everything else on this page is in Rebota today.
Does Rebota also work for CGD pipeline laying contractors, PNG house connection contractors or steel and MDPE pipeline contractors?
Yes. The steps on this page are the same for CGD pipeline laying contractors, PNG house connection contractors, steel and MDPE pipeline contractors, horizontal directional drilling (HDD) contractors, CNG station builders, gas meter installation contractors and pipeline testing and commissioning crews: free-issue pipe and fittings: receipts, returns, penal recovery (Free-issue Material); excavation and hot-work permits (Safety); daily progress with photos, offline site capture (Site Capture); pressure test: test pressure, hold time, drop (Testing & Commissioning).
Asked another way? Same answer.
Which is the best software for city gas distribution contractors?
One that keeps the whole job in one account, not only the bills. For city gas distribution contractors, Rebota covers 8 steps, each on its own screen, among them: free-issue pipe and fittings: receipts, returns, penal recovery (Free-issue Material); excavation and hot-work permits (Safety); daily progress with photos, offline site capture (Site Capture); pressure test: test pressure, hold time, drop (Testing & Commissioning); hindrance register with extension of time (Hindrance Register). Not built yet: road-cutting and right-of-use permissions; weld or joint register with radiography. You can try all of it free for 5 days, with no card.
CGD pipeline contractor ka hisab rakhne ke liye kaun sa app accha hai?
Aisa app jo poora kaam ek jagah rakhe: Free-issue Material, Safety, Site Capture, Testing & Commissioning aur Hindrance Register. Rebota mein yeh sab ek hi account mein hai. 5 din ka free trial hai, card nahin chahiye, aur trial ke baad ek user ke liye free chalta hai. Android app Google Play par hai, aur PC ya laptop par browser mein chalta hai.
Is there free CGD pipeline contractor software?
Yes. Every account starts with 5 days of all modules and no card, and after that Rebota stays free for 1 user, 30 GST invoices a month, stock, suppliers and cash. When you need more users or modules: Starter ₹15,000 a year, up to 5 users, plus GST.
Is there a mobile app for city gas distribution contractors?
Yes. The Rebota ERP app is on Google Play for Android, there is a desktop installer for Windows PCs, and on an iPhone you open Rebota in Safari and add it to the Home Screen. The same account works on all of them, and each person signs in with their own access.
Does it make GST bills for city gas distribution contractors?
Yes. In Rebota: measurement book linked to the BOQ (Measurement Book); client RA bills with retention and TDS (Customer Billing). The bills go to the same GST books, with the CGST, SGST and IGST split.
Free formats for city gas distribution contractors.
Fill in online and download a PDF, or print one blank. No sign-up.
Not quite you? Rebota has a page for each kind.
- Airport works contractors →
- Bridge and flyover contractors →
- Dam and hydro contractors →
- Industrial EPC contractors →
- Irrigation and canal contractors →
- Marine works contractors →
Also: Power transmission and distribution contractors · Railway and metro contractors · Road and highway contractors · Solid waste management contractors · Telecom tower and fibre contractors · Tunnelling contractors · Water and sewer pipeline contractors · Water and wastewater treatment plant EPC contractors · Wind EPC contractors · Software for government contractors · Tender and bank guarantee tracking · Price escalation bill software · Plant and equipment management
All of Rebota for infrastructure & epc →Every Rebota page for infrastructure →Software for city gas distribution contractors compared →All industries →
What your CGD contracting firm pays. One price per company.
Start free for 5 days, no card needed. After the trial, keep using Rebota free: 1 user, 30 GST invoices a month, stock and cash.
In India: Basic from ₹5,490 a year for up to 3 users, Starter from ₹15,000 a year for up to 5 users. Billed yearly, GST extra. Plans never renew or charge you automatically.
