RebotaREBOTA/Works Search tools, standards, templates… Ctrl K Rebota → Join free
Join free Log in Rebota business platform →

Resource Catalogue

Search and filter every calculator, standard, template, checklist, estimator and guide in one place.

All types Calculator (94) Standard (3) Template (4) Checklist (3) Estimator (4) Guide (55)

55 resources

Most construction businesses in India lose 5-12% of turnover to leaks spread across material, labour, equipment and cash flow.
Updated Jul 2026 Universal
How a SIP calculator works: the future-value formula, XIRR, step-up SIPs and what ₹5,000 or ₹10,000 a month becomes over 10, 15 a…
Updated Sep 2026 Universal
How to add VAT to a price and remove VAT from a VAT-inclusive total, with the VAT fraction for 5%, 15% and 20% and worked UK, UAE…
Updated Sep 2026 Universal
A practical guide to setting tender margin — overhead recovery, risk contingency and target profit.
Updated Jul 2026 Universal
Salary structures, statutory PF/ESIC/PT compliance, payslip generation, and leave management — built for construction and project…
Updated Aug 2026 Construction
How HRA exemption is calculated under Section 10(13A): the three-way minimum rule, metro vs non-metro, rent receipts, landlord PA…
Updated Sep 2026 Universal
Income tax slabs for FY 2026-27 (AY 2027-28) under the new and old regime, the ₹12 lakh rebate, standard deduction, cess and work…
Updated Oct 2026 Universal
Material receipt, stock ledger, and warehouse tracking connected to BOQ consumption — so site-level material reconciliation isn't…
Updated Aug 2026 Construction
The questions that separate real inventory software from a stock register — valuation method, batch and serial traceability, whet…
Updated Sep 2026 Universal
What the TMT bar grade number actually means, when a structural engineer specifies Fe500D over Fe500, and how grade choice change…
Updated Sep 2026 Universal
Sieve analysis, silt content, and flakiness index explained in plain terms, with the acceptance limits site engineers actually ne…
Updated Sep 2026 Universal
The most important clauses in IS 456:2000 explained for working engineers: cover requirements, development length, mix design, cu…
Updated Sep 2026 Universal
BOCW Act, CLRA Act, EPF, ESIC, and minimum wages explained for Indian construction companies — what every contractor must comply …
Updated Sep 2026 Universal
Attendance gets tracked closely. Output against planned quantity almost never does.
Updated Jul 2026 Universal
Production orders connected to inventory and warehouse stock — for fabrication and manufacturing businesses that need material co…
Updated Aug 2026 Manufacturing
Discrete or process, routings with honest setup and run times, traceability that survives a recall, and costing that settles agai…
Updated Sep 2026 Universal
Most contractors decide owned vs hired equipment once, at purchase, and never revisit it.
Updated Jul 2026 Universal
The difference between profit margin and markup, the formulas, a conversion table (25% markup = 20% margin) and why pricing on th…
Updated Sep 2026 Universal
Real project margin, rolled up from actual labour, material, and equipment cost data — never fabricated, shows null when data is …
Updated Aug 2026 Construction
Most construction procurement jumps straight from "we need material" to a WhatsApp message to a vendor. Here is the full PR-to-pa…
Updated Sep 2026 Universal
Save & Access Anywhere
Save your favorite tools & resources
Smart Search (Ctrl+K)
Find what you need in seconds
Community Support
Ask questions & get real answers
Regularly Updated
New tools, templates & guides added