Rebota Works · Estimators

Free Construction Estimators — CPWD & IS Norms

Three tools in one: Quick BOQ cost estimate, IS-standard material consumption calculator, and CPWD productivity norms — all sourced from CPWD DSR 2021 and BIS standards.

3
Estimators
CPWD
DSR 2021 Sourced
Free
No Signup

Quick BOQ Cost Estimator

Enter your project type and area to get a ball-park cost estimate based on current Indian market rates (Q3 2024). Not a substitute for a detailed BOQ — use as a first-cut sanity check.

Estimated Project Cost

—

—

Need a detailed BOQ? Rebota ERP generates itemised BOQs from your project scope — linked to live procurement and inventory. Try Free →

Enter the type of work and quantity to get IS-standard material consumption figures including 5% wastage allowance (per CPWD DSR 2021).

Materials Required

MaterialPer UnitTotal (with 5% wastage)

Source: CPWD DSR 2021 · IS 456:2000 · IS 383:2016 · Wastage factor: 5% added to all quantities.

Track material consumption live in Rebota — compare planned vs actual per activity and get stock-out alerts before they happen. Try Free →

Standard CPWD DSR 2021 labour productivity norms for common construction activities. Use these to plan manpower and compare your site's actual output.

How to use: If your activity quantity is 200m² of plastering and you have 8 masons, expected duration = (200 × 0.08 man-days) ÷ 8 = 2 days.

Activity Unit Mason (man-days) Helper (man-days) CPWD Reference
RCC work (columns, beams, slabs) m³ 0.65 1.30
CPWD DSR 2021, Item 5.22
Brickwork 230mm thick m³ 1.10 1.75
CPWD DSR 2021, Item 6.1
Plastering 12mm (walls) m² 0.08 0.04
CPWD DSR 2021, Item 7.1
Excavation — ordinary soil, <1.5m m³ — 0.32
CPWD DSR 2021, Item 1.1
Bar bending & binding MT 5.00 5.00
CPWD DSR 2021, Item 5.10
Formwork to slabs (soffit) m² 0.12 0.06
CPWD DSR 2021, Item 5.5
Floor tiling 600×600 m² 0.18 0.09
CPWD DSR 2021, Item 9.3
Internal painting — 2 coats m² 0.04 0.02
CPWD DSR 2021, Item 13.6
Earthwork filling & compaction m³ — 0.28
CPWD DSR 2021, Item 1.7
PCC bed (M10) m³ 0.50 1.00
CPWD DSR 2021, Item 2.1
Waterproofing — terrace m² 0.10 0.05
IS 6494:1988
Plumbing — copper pipe fitting point 0.50 0.25
CPWD DSR 2021, Item 15.2
Compare your site against these norms automatically. Rebota's Labour module tracks daily man-days per activity and flags productivity gaps in real time. Try Free →
Source: CPWD DSR 2021 · Reviewed: Nov 2024 · Related: IS Code Library →
Save & Access Anywhere
Save your favorite tools & resources
Smart Search (Ctrl+K)
Find what you need in seconds
Community Support
Ask questions & get real answers
Regularly Updated
New tools, templates & guides added