Construction Intelligence · Material

Plaster Calculator

Cement bags and sand for any plastering job — by area, thickness and mix — with cost at your rates.

Engineering Calculator

Your inputs are remembered on this device only — never sent to Rebota.

Engineering Analysis

Current Cost / Exposure
₹0
Industry Average
₹0
Recoverable Amount
₹0
—

Industry Benchmark

WhatsApp LinkedIn

Project Snapshot

This sets the context for every benchmark, health score and recommendation — a residential project in Maharashtra and a government road project in Bihar do not share the same "normal." Adjust it and calculate again to sharpen the comparison.

Professional Practices

Why Contractors Lose Money Here

Plaster thickness drives everything: every extra 3 mm on a wall is 25% more cement and sand at 12 mm. Uneven brickwork, filled with plaster, quietly doubles consumption on some walls.

Real Site Example

100 m² of internal wall at 12 mm in 1:6: wet 1.2 m³; dry 1.2 × 1.27 = 1.524 m³; +5% = 1.600 m³; cement 1.600 ÷ 7 = 0.229 m³ = 329 kg ≈ 6.6 bags (order 7); sand 1.37 m³ (48 cft).

Professional Best Practices

Fix level dots and screeds first so the thickness is controlled, cure plaster for at least 7 days, and track cement per floor so an over-thick floor shows up early.

Engineering Checklist

  • Use 12 mm for internal walls, 6 mm for ceilings, 15–20 mm for external walls (or as specified)
  • Check walls for plumb and hollows before plastering
  • Use clean, well-graded plaster sand
  • Cure for at least 7 days
  • Record cement used per floor against the estimate

Government & Standards References

  • IS 1661:1972 — Code of practice for cement and cement-lime plaster finishes on walls and ceilings
  • IS 1542 — Sand for plaster
  • CPWD specifications — plastering

How Experienced Contractors Handle This

Contractors set a cement-per-square-metre target for each plaster type and compare it floor by floor with what the store issued.

Common Mistakes

Patterns we see repeatedly across Indian construction sites — worth checking against your own process.
1
Estimating at 12 mm when walls are uneven
Actual thickness of 18–20 mm uses 50–65% more material than the estimate.
2
Forgetting the dry-volume factor
Cement and sand are under-ordered by about a quarter.
3
Using the internal-wall mix outside
A lean 1:6 mix on external walls cracks and lets water in; external walls usually get 1:4.

How Rebota Automates This

Rebota's Daily Site Log records plaster area done and cement issued each day, and flags floors where consumption runs above the estimate.

BOQ & Estimation
Daily Site Logs
Material Reconciliation
₹0
₹0
Annual Cost
₹0
Est. ROI
0X
Start Free Trial — See This Inside Rebota →

Related Resources

Frequently Asked Questions

How much cement is needed for 100 sq ft of plaster?▾
At 12 mm thickness in 1:6, about 0.6 bags of cement and 4.3 cft of sand for 100 sq ft, before wastage. At 20 mm in 1:4 it is about 1.4 bags.
What is the dry volume factor for plaster?▾
This calculator uses 1.27: the dry cement-sand mix shrinks when water is added, so about 1.27 m³ of dry material makes 1 m³ of wet plaster. Some estimators use 1.33 with a separate allowance for joints.
What plaster thickness should I use?▾
Commonly 6 mm on ceilings, 12 mm on internal walls and 15–20 mm on external walls, as the specification states.
Does this calculator store my data?▾
No. The calculation runs in your browser.
This is one item, on one day.Rebota holds consumption against your BOQ on a live stock ledger, so wastage shows up while you can still act on it.
See it on real stock →
Save & Access Anywhere
Save your favorite tools & resources
Smart Search (Ctrl+K)
Find what you need in seconds
Community Support
Ask questions & get real answers
Regularly Updated
New tools, templates & guides added