RebotaREBOTA/Works Search tools, standards, templates… Ctrl K Rebota → Join free
Join free Log in Rebota business platform →
Construction Intelligence · Reinforcement

BBS Height Calculator

The three heights a slab and column BBS needs: crank height, chair height and the length of a column bar for one floor.

Engineering Calculator

Your inputs are remembered on this device only — never sent to Rebota.

Engineering Analysis

Current Cost / Exposure
₹0
Industry Average
₹0
Recoverable Amount
₹0
—

Industry Benchmark

WhatsApp LinkedIn

Project Snapshot

This sets the context for every benchmark, health score and recommendation — a residential project in Maharashtra and a government road project in Bihar do not share the same "normal." Adjust it and calculate again to sharpen the comparison.

Professional Practices

Why Contractors Lose Money Here

A height that is off by one cover or one bar diameter repeats in every bar of the same mark: cranks that do not sit on the top steel, chairs that push the top mesh into the cover, and column bars that come up short of the lap.

Real Site Example

150 mm slab, 20 mm top and bottom cover (IS 456 Table 16, mild exposure), 10 mm crank bars, bottom mesh 10 + 8 mm, top mesh 8 + 8 mm: crank height = 150 − 20 − 20 − 10 = 100 mm; chair height = 150 − 20 − 20 − 18 − 16 = 76 mm. Column with 3.0 m floor-to-floor height, 16 mm Fe500 bars in M25: Ld in tension = 16 × 435 / (4 × 1.4 × 1.6) = 777 mm; in compression 777 ÷ 1.25 = 621 mm, more than 24φ = 384 mm, so the lap is 625 mm and each bar is 3,000 + 625 = 3,625 mm (5.73 kg).

Professional Best Practices

Take every height from the member depth on the drawing, deduct the cover on both faces and the bars in between, and write the result on the BBS line so the bar bender does not work it out on site.

Engineering Checklist

  • Crank height: slab thickness − top cover − bottom cover − crank bar diameter
  • Chair height: slab thickness − both covers − both bottom layers − both top layers
  • Covers from the drawing; otherwise IS 456 Cl. 26.4.2 and Table 16 for the exposure
  • Column lap: Ld in compression, not less than 24φ (IS 456 Cl. 26.2.5.1(d)), unless the drawing gives a value
  • Foundation starter bars and top-floor bars follow the drawing, not the per-floor length

Government & Standards References

  • IS 456:2000 — Clause 26.4.2 and Table 16 (nominal cover: 20 mm mild, 30 mm moderate, 45 mm severe, 50 mm very severe, 75 mm extreme exposure)
  • IS 456:2000 — Clause 26.4.2.1 (column longitudinal bars: cover not less than 40 mm nor less than the bar diameter) and 26.4.2.2 (footings: at least 50 mm)
  • IS 456:2000 — Clause 26.2.1 and 26.2.1.1 (development length; design bond stress, +60% for deformed bars, +25% in compression)
  • IS 456:2000 — Clause 26.2.5.1(d) (lap length in compression)
  • IS 2502 — bending and fixing of bars for concrete reinforcement

How Experienced Contractors Handle This

Estimators keep one BBS line per bar mark with its shape, dimensions and heights, and total the schedule by diameter for the steel order.

Common Mistakes

Patterns we see repeatedly across Indian construction sites — worth checking against your own process.
1
Using the slab thickness as the crank height
The crank is taller than the space between the layers, so the bar is cut too long and does not sit on the top steel.
2
Leaving the bar layers out of the chair height
The top mesh is lifted into the cover zone and the top cover is lost.
3
Taking column bars as the floor height only
No lap is left above the slab, and every bar needs a coupler or a new length.

How Rebota Automates This

Rebota's BBS calculator builds the schedule shape by shape and totals it by diameter; site issues are reconciled against it in the Daily Site Log.

BOQ & Estimation
Material Reconciliation
₹0
₹0
Annual Cost
₹0
Est. ROI
0X
Start Free Trial — See This Inside Rebota →

Related Resources

Frequently Asked Questions

What is the crank height in a BBS?▾
The vertical distance the bent-up bar climbs, from the bottom layer to the top layer: slab thickness − top cover − bottom cover − bar diameter. For a 150 mm slab with 20 mm covers and 10 mm bars it is 100 mm.
How do you work out the chair height?▾
Slab thickness − top cover − bottom cover − the bars of the bottom mesh the chair stands on − the bars of the top mesh it holds up. For a 150 mm slab, 20 mm covers, 10 + 8 mm bottom bars and 8 + 8 mm top bars it is 76 mm.
How long is a column bar for one floor?▾
Floor-to-floor height plus one lap. Column bars are in compression, so IS 456 Clause 26.2.5.1(d) sets the lap at the development length in compression, not less than 24φ, unless the drawing gives a longer value.
Does this page give stirrup heights?▾
No. Stirrup dimensions depend on whether the drawing gives inner or out-to-out sizes; use the BBS calculator or the stirrup cutting length calculator with the drawing's convention.
Does this calculator store my data?▾
No. The calculation runs in your browser.

Software for this work

This is one item, on one day.Rebota holds consumption against your BOQ on a live stock ledger, so wastage shows up while you can still act on it.
See it on real stock →
Save & Access Anywhere
Save your favorite tools & resources
Smart Search (Ctrl+K)
Find what you need in seconds
Community Support
Ask questions & get real answers
Regularly Updated
New tools, templates & guides added